We will respond to you within 24 hours, during regular business hours. All email correspondence is completely confidential.
Request a Quote
Request a Quote
We can provide an Estimate for your any of your projects, listed below are the items needed to provide an estimate.
- Contract drawings of proposed scope of work.
- Specifications of duct construction and piping.
- Our scope of work. Shop drawings, As-Built, ductwork, piping, spool drawings, BIM, coordination meetings.
- If any coordination meetings attendance is needed and how many would be required to be attend for coordination services.
What is needed to start shop drawing production
- A full set of IFC contract drawings in paper format or PDF’s (paper is preferred)
- Project specification sections Division 1 and Division 15.
- CAD files in .dwg format:
- Architectural floor plans to include grid.
- Reflected ceiling background drawings.
- Structural drawings
- Submittals of:
- Grilles, registers and diffusers.
- RTU’S, AHU’S, EXHAUST FANS, VAV BOXES and any other mechanical equipment.
- Duct/ Shop Standards or option to use Northwest duct productions standards (if none provided we will use SMACNA/ANSI standards).
- Signed proposal with any production deposit needed as per Estimate provided.